A selection of engineering reviews and client notes from corporate data center builds across Malaysia. Each entry reflects a specific scope, constraint, and outcome we observed on site.
We reworked the low-level design for a Penang colocation hall after the original cable trays conflicted with the cooling plenum. The revised LLD reduced overhead tray crossings by 38% and gave the commissioning team a clear path for fiber and power separation.
Infrastructure audit, Q3 2024Our team produced a detailed fiber route plan for a 12-story office tower, mapping every bend radius and splice point before installation. The client used the blueprint to negotiate floor space with the building owner and avoided two major rework cycles.
LLD package, 14 weeks on siteFor a 24-rack high-density zone, we aligned the LLD with the CRAC unit placement and hot-aisle containment geometry. The final diagram set included per-rack airflow annotations, which the mechanical contractor followed without further clarification.
Design coordination, 2024An existing server room needed a full cable infrastructure overhaul. We documented every horizontal and vertical pathway, separating Cat6a runs from single-mode fiber by the required distance. The retrofit was completed without a single cable pull being redone.
Retrofit LLD, 6 weeksWe created a port-level mapping diagram for a main distribution frame, linking every patch panel position to the corresponding rack and switch port. The client's NOC team now uses the diagram as the reference for all daily patching work.
Documentation set, delivered with as-builtAn LLD blueprint from Expertlld covers rack elevations, fiber and copper cable schedules, power distribution paths, cooling airflow diagrams, and labeling conventions. Each drawing is tied to the specific floor plan of your server room, so the document set can be handed directly to installation teams without further interpretation.
We start with a site survey to map what is already in place: active ports, patch panel positions, breaker assignments, and cable routes. That baseline becomes the foundation of the new LLD, so we are not designing in a vacuum. If something cannot be verified on site, it is flagged in the drawing set rather than assumed.
Yes. The whole point of a low level design is to remove ambiguity. Every cable is numbered, every rack is referenced to a grid coordinate, and every termination point is labeled. A contractor with basic telecom training should be able to execute the build without asking the facility team for clarifications.
We include one revision cycle in the standard engagement. That covers changes that come up during the review meeting, such as a rack move or a different switch placement. Additional revision rounds are scoped separately, and we document every change so the drawing set stays consistent.
For a single server hall with up to 40 racks, the survey and drawing production usually takes three to four weeks. Larger facilities with multiple halls or complex fiber backbone routes take longer. We give you a milestone schedule before the work starts, so you know when each drawing package will be ready for review.
Yes. We work with corporate data centers across Malaysia. For sites outside Penang, the survey phase is done remotely with your on-site team, or we arrange a short visit if the facility is complex enough to justify it. The drawing production and review process is identical regardless of location.
Need a specific answer about your facility? Contact our engineering team at info@expertlld.com or review our terms of engagement before starting a project.