Field evidence from completed LLD projects

A selection of engineering reviews and client notes from corporate data center builds across Malaysia. Each entry reflects a specific scope, constraint, and outcome we observed on site.

Frequently Asked Questions

What exactly is included in a Low Level Design (LLD) blueprint?

An LLD blueprint from Expertlld covers rack elevations, fiber and copper cable schedules, power distribution paths, cooling airflow diagrams, and labeling conventions. Each drawing is tied to the specific floor plan of your server room, so the document set can be handed directly to installation teams without further interpretation.

How do you handle existing infrastructure that was built without proper documentation?

We start with a site survey to map what is already in place: active ports, patch panel positions, breaker assignments, and cable routes. That baseline becomes the foundation of the new LLD, so we are not designing in a vacuum. If something cannot be verified on site, it is flagged in the drawing set rather than assumed.

Can your LLD documents be used by contractors who are not familiar with our facility?

Yes. The whole point of a low level design is to remove ambiguity. Every cable is numbered, every rack is referenced to a grid coordinate, and every termination point is labeled. A contractor with basic telecom training should be able to execute the build without asking the facility team for clarifications.

Do you provide revisions after the initial LLD is delivered?

We include one revision cycle in the standard engagement. That covers changes that come up during the review meeting, such as a rack move or a different switch placement. Additional revision rounds are scoped separately, and we document every change so the drawing set stays consistent.

What kind of timeline should we expect for a typical data center LLD project?

For a single server hall with up to 40 racks, the survey and drawing production usually takes three to four weeks. Larger facilities with multiple halls or complex fiber backbone routes take longer. We give you a milestone schedule before the work starts, so you know when each drawing package will be ready for review.

Is your LLD service available for facilities outside Penang?

Yes. We work with corporate data centers across Malaysia. For sites outside Penang, the survey phase is done remotely with your on-site team, or we arrange a short visit if the facility is complex enough to justify it. The drawing production and review process is identical regardless of location.

Need a specific answer about your facility? Contact our engineering team at info@expertlld.com or review our terms of engagement before starting a project.